RIVET & RIDGE

How we size a Revenue Cloud Advanced build

Pick a tier for each part of the build and watch the hours add up — including the discovery, testing, go-live and PM hours most estimates leave out. Built for the people who have to sanity-check scope on a call.

Download the PDF Two pages, the full grid. Version 0.8, public preview. No form, no email required.

Size a deal

Quote-to-Cash, amendments and renewals. Build hours only — the wrapper (discovery, UAT, go-live, hypercare, PM) is added for you. Billing-on-core excluded. Sections can and should land in different tiers; tap What puts you here? under any section if you're unsure.

Build0 Wrapper0 Total hours0

Ranges, not a quote. The low end assumes clean requirements, one decision-maker, and a client team that shows up. Most projects land in the upper half.

You've picked Quickstart somewhere. Quickstart is a fixed-fee productized offering priced on a $200/hr basis — an introductory rate tied to fixed scope; T&M engagements price separately. Integrations and data migration are excluded from the fixed fee: nearly every implementation needs at least one integration, so the first standard connector is a fixed-fee add-on scoped at 60–120 hours (S-tier archetype), quoted at signature. At Quickstart, CLM covers renewals and cancellations only; amendments start at S.

How big is a tier?

Totals if every section lands in the same column. Real projects mix columns — that's what the estimator above is for.

TierBuildWrapperTotal hours
Quickstartexcludes integrations & data migration240–320225–290465–610
S440–860335–525775–1,385
M1,100–2,040570–9751,670–3,015
L2,460–4,1701,060–1,6803,520–5,850
XL4,590–7,5501,830–2,9006,420–10,450

Things that move the number

If any of these sound like your business, expect the matching sections above to land a tier higher than your first guess. That's not padding — it's where the hours actually go.

“Our pricing is really complicated.”
Pricing procedures and pricing plans move up a tier. Complicated pricing is where the hours hide.
“We have hundreds of products.”
Product catalog and pricing move up. SKU count drives modeling time more than anything else.
“We do channel or partner pricing.”
Pricing plans move up. Each channel is its own pricing model, not a discount on the list price.
“We sell internationally.”
Pricing plans, quote, and proposal all move up. Multi-currency touches every document you generate.
“We need branded proposals for each business unit.”
Quote proposal & eSignature moves up. Each brand is a template set, not a logo swap.
“Our contracts need multiple signers, in order.”
Quote proposal & eSignature goes to L or XL. Signing order is routing logic, and routing logic is build time.
“Our customers add seats and change orders all the time.”
CLM actions move up. Amendments are a second product to build, not a checkbox.
“We have evergreen or month-to-month contracts.”
CLM actions go to L or XL. Evergreen renewals are the hardest scenario in the whole rubric.
“We have years of existing contracts to bring over.”
Data migration moves up sharply. Contract history is the dirtiest data you own.
“Pricing has to come from another system in real time.”
Pricing procedures goes to XL. That's custom Apex, not configuration.
“We run multiple business units or brands.”
Catalog, pricing, and proposals all move up. Every business unit multiplies the catalog.
“We bill on usage.”
That's metering, and it sits outside this rubric. Worth a separate conversation.
“We're replacing a CPQ we already have.”
Data migration moves up, and re-platforming risk comes with it. Your existing rules won't map one-to-one.
“It has to talk to NetSuite (or SAP, or…).”
Add one integration per system in the estimator. Count them separately — they never bundle.

This is version 0.8, and we mean it

These ranges come from our own delivery history, which makes them honest and incomplete at the same time. If a number here doesn't match what you have seen in the field, tell us and we'll fix it.

Download the PDF

Rivet & Ridge LLC · hello@rivetandridge.com · Senior-led, on-shore, no half-measures.